05Buildings & Places

The Global Gateway

Gold Coast Airport Southern Terminal Expansion

ArchitectHassell
Building typeBehind the scenes
Year Built2022
Date7 October 2023
Opening Hours11:30 am - 3:30 pm
Photography PermittedYes
Photography by Scott Burrows
Add to trip planner
Address
Terminal Drive, Bilinga

BOOKINGS CLOSED

Gold Coast Airport's three-year southern terminal expansion project officially opened in 2022, ensuring Gold Coast Airport is positioned as the preferred domestic and international gateway to the spectacular destinations of the Gold Coast and northern NSW.

In this behind-the-scenes tour, explore the operation and design intent behind the expansion. including the new international departures lounge, aerobridges and swing capability between Domestic and International modes.

The modern three-level, 30,000sq metre expansion, which connects seamlessly with the existing terminal, took three years to build and created over 2,000 local jobs.

It includes new shops, cafes, and six new gates allowing for a total of 19 aircraft to now be accommodated on the tarmac. There are new border control facilities, four glass aerobridges, seven escalators and nine lifts, a departure lounge, and a new baggage handling area.

Other details:

  • Some photography is permitted at this venue. Please follow the instructions of your tour guide on the day.
  • Pre-screening and security clearances will be required for registered participants.
  • Parking passes will be provided for short-term car park.
  • Tour duration approximately 45 minutes.

Images via Hassel. Photography by Scott Burrows.

 

 

Share This

Select your desired option below to share a direct link to this page